Greetings Cool mornings, sunny days, if it weren’t for the dust, mud and mess, life at 900 University Bay would be near perfect. Paving is scheduled for early August. Sidewalk Superintending With a new sidewalk and topsoil the Campus is really starting to take shape. The new stone wall in the berm is for the Kitchen ventilator. There are stubs of gray pipe projecting from the ground which will connect to bollard (short post) lights. From Marshall Court you can see The East Courtyard Walls. Inside The saws are out of the Auditorium, and the clean-up has begun. The Venetian Plaster wall is done. I was gazing at it, and the plasterer said, “You can touch it.” It feels like polished marble. Volunteers We will be painting C wing classrooms in about three weeks. There will be lots of planting , seeding and watering starting the week of July 14. -- David Weber, Owners Representative davidw@fusmadison.org Want to stop getting Dave's ramblings? "Yes you can!" Click here to visit our subscription center Thanks!
Venetian Plaster: After all the talk and puzzling, it’s finally done.. |
East Courtyard: It’s becoming a courtyard. Note the new railing. |
|
![]() |
|
Kitchen Tile: The empty space is for the dishwasher (visible in the lower left corner).
|
|
![]() |
|
Library Doors: This our view when we come out of the Auditorium |
|
![]() |
|
The door to the Assistant Music Directors office is surrounded by windows. |
|
Refreshments: Drinks for the crew. |
|